Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus et auctor arcu. Quisque pharetra nibh sit amet erat interdum viverra. Suspendisse tempor nunc ac varius pharetra. Nulla nec tristique diam. Duis ac vehicula libero, et pretium ante. Pellentesque a nibh ut ante dignissim aliquet. 

CSD has longstanding client relationships and deep experience in specialized situations, making us the ideal Erection Engineer for time-critical projects. The project schedule for the North Andover Distribution Facility in...

Acrisure Arena

Thousand Palms, CA

As Erection Engineer, CSD aided in the construction of the home of the Coachella Valley Firebirds of the American Hockey League, the Acrisure Arena. This event venue and arena can...

Evraz Rail Mill

Pueblo, CO

Evraz North America’s new rail mill will produce sections to support the railroad industry. The complex includes several structures with overhead cranes and long span trusses to enclose the steel...

Ismaili Center

Houston, TX

CSD served as Erection Engineer for the new Ismaili Center, located in Houston, Texas. With a contemporary design incorporating large open atrium spaces framed with structural steel connected to a...

Baird Center

Milwaukee, WI

The expansion to the downtown Milwaukee convention center, the Baird Center, will open in Spring of 2024. The expansion will double the size of the existing facility, including 300,000 square...

Shockwave Hangar

Jacksonville, FL

Longstanding client relationships are the basis for many of the projects to which CSD brings expertise. The construction of the Shockwave Hanger in Jacksonville, Florida added  370,000 square feet of...

As Erection Engineer for the construction of the new hanger that supports the 115th Fighter Wing based at Traux Field in Madison, Wisconsin, CSD provided guidance for lifting, uprighting elements,...

BOK Center

Tulsa, OK

The BOK Center is a multi-use arena for concerts, performances, and professional sports events. The roof structure is comprised of long span trusses. The entrance to the BOK Center is...

CSD evaluated the Energy Center for different stages of steel erection and provided plans to maintain stability. The evaluation confirmed the load path for construction forces, temporary bracing needs, connection...

Met II is a commercial office building and hotel located in downtown Miami. The building compromises two towers built upon a single parking structure. The Wells Fargo tower is a...

The Sprint Center is a multi-use arena for concerts, performances, and professional sports events. The roof structure utilized primary long-span roof trusses in one direction along with additional header and...

The Applied Research Center at Florida Polytechnic University features laboratories, student space, conference rooms, and offices. The two-story building includes a unique geometric design with a large section of the...

The Kinder Building includes a unique and complex structural steel roof framing system comprised of sloping and curved trusses. CSD analyzed the trusses and frame elements for strength and stability...

UTOC Hangar

Houston, TX

The UTOC Hangar is a tall long span truss structure to accommodate airplanes. The stability of long span members is dependent on secondary members and infill members that were not...

CSD provided construction engineering services to the steel erector for the Exploria Soccer Center. The roof structure includes long span cantilever members that were expected to meet strict erection tolerances....

The new Duke Energy Edwardsport IGCC project is an integrated gasification combined cycle power plant that replaces smaller and older units already at the plant. The project includes large equipment,...

Connect with the Experts

CSD is dedicated to the success of your project. Our team of experts brings an unmatched level of ingenuity and experience to provide value to our clients. To move your project forward, contact us via phone or email today.